
Article content
Consistently strong intersections extend known mineralisation ahead of December quarter Mineral Resource Estimate update; First results from economic studies due early next year
THIS CONTENT IS RESERVED FOR SUBSCRIBERS ONLY
Subscribe now to read the latest news in your city and across Canada.
- Exclusive articles from Barbara Shecter, Joe O'Connor, Gabriel Friedman, and others.
- Daily content from Financial Times, the world's leading global business publication.
- Unlimited online access to read articles from Financial Post, National Post and 15 news sites across Canada with one account.
- National Post ePaper, an electronic replica of the print edition to view on any device, share and comment on.
- Daily puzzles, including the New York Times Crossword.
SUBSCRIBE TO UNLOCK MORE ARTICLES
Subscribe now to read the latest news in your city and across Canada.
- Exclusive articles from Barbara Shecter, Joe O'Connor, Gabriel Friedman and others.
- Daily content from Financial Times, the world's leading global business publication.
- Unlimited online access to read articles from Financial Post, National Post and 15 news sites across Canada with one account.
- National Post ePaper, an electronic replica of the print edition to view on any device, share and comment on.
- Daily puzzles, including the New York Times Crossword.
REGISTER / SIGN IN TO UNLOCK MORE ARTICLES
Create an account or sign in to continue with your reading experience.
- Access articles from across Canada with one account.
- Share your thoughts and join the conversation in the comments.
- Enjoy additional articles per month.
- Get email updates from your favourite authors.
THIS ARTICLE IS FREE TO READ REGISTER TO UNLOCK.
Create an account or sign in to continue with your reading experience.
- Access articles from across Canada with one account
- Share your thoughts and join the conversation in the comments
- Enjoy additional articles per month
- Get email updates from your favourite authors
Sign In or Create an Account
or
Article content
KEY POINTS
Article content
Article content
- FireFly made rapid progress during the quarter across the four key planks of its growth strategy; These comprise Mineral Resource growth, upgrading Inferred Resources to the Measured and Indicated (M&I) categories, new discoveries, and economic studies for an upscaled production restart at the Green Bay Project in Canada
- Growing global investor recognition of the strong outlook at Green Bay was reflected in FireFly’s addition to the S&P/ASX 300 Index
- Subsequent to the end of the quarter, FireFly announced assays from step-out drilling which extended the known mineralisation by another 650m (see ASX announcement dated 16 October 2025)
- The results included:
- 49.0m @ 6.1% copper equivalent (CuEq)1 (4.9% Cu & 1.3g/t Au) in hole MUG25-202 (~39.2m true thickness), including 14.3m @ 13.7% CuEq (10.6% Cu & 3.2% Au) (see ASX announcement dated 16 October 2025)
- Infill drilling of the Volcanogenic Massive Sulphide (VMS) lenses continued to generate outstanding assays including (see ASX announcement dated 17 July 2025):
- 11.6m @ 9.3% CuEq1 (6.0% Cu & 3.9g/t Au) in hole MUG24-128
(~ true thickness) - 5.5m @ 7.1% CuEq (5.4% Cu & 2.0g/t Au) in hole MUG25-014
(~ true thickness) - 14.6m @ 6.7% CuEq (5.4% Cu & 1.5g/t Au) in hole MUG25-032
(~ true thickness)
- 11.6m @ 9.3% CuEq1 (6.0% Cu & 3.9g/t Au) in hole MUG24-128
- Drilling of the broad Footwall Stringer Zone continued to demonstrate thick and consistent copper mineralisation, pointing to the potential for large-scale bulk mining. Intersections include (see ASX announcement dated 17 July 2025)
- 9.5m @ 6.4% CuEq (6.1% Cu & 0.4g/t Au) followed by a further zone of 24.9m @ 2.4% CuEq (2.2% Cu & 0.1g/t Au) in hole MUG25-073
(~ true thickness) - 26.2m @ 5.3% CuEq (4.9% Cu & 0.4g/t Au) in hole MUG25-015
(~ true thickness) - 24.1m @ 3.7% CuEq (3.5% Cu & 0.3g/t Au) in hole MUG25-042
(~ true thickness)
- 9.5m @ 6.4% CuEq (6.1% Cu & 0.4g/t Au) followed by a further zone of 24.9m @ 2.4% CuEq (2.2% Cu & 0.1g/t Au) in hole MUG25-073
- The first modern geophysical programs were completed over the project area, resulting in numerous significant drill-ready targets being defined (see ASX announcement dated 24 July 2025)
- FireFly continued to lay the foundations at Green Bay with environmental approvals for an upscaled restart operation now secured,2 mining studies and construction permitting underway and metallurgical tests returning outstanding results (see ASX announcement dated 5 August 2025)
- Metallurgical tests on 1.5 tonnes of material from the Ming Mine showed that the mineralisation is metallurgically amenable to conventional low-cost processing, with copper recovery exceeding 98% and gold recovery exceeding 85% (see ASX announcement dated 5 August 2025)
- Exploration activities commenced at the prospective Tilt Cove Project that was acquired by the Company in late 2024; Historical mining at the Tilt Cove Mine, only ~30km east of the Ming Mine, produced ~170,000t of copper and 50,000oz of gold from a large-scale Volcanogenic Massive Sulphide (VMS) system (see ASX announcement dated 24 July 2025)
- Ground-based EM completed by FireFly at Tilt Cove confirmed an extensive untested conductive anomaly first identified by Newmont Exploration in the 1980s; Drill testing of the anomaly is planned for Q4 2025 (see ASX announcement dated 24 July 2025)
- FireFly successfully completed the second tranche of an equity raising and share purchase plan (SPP) (see ASX announcement dated 11 July 2025 and 3 September 2025)
- The Company emerged with ~A$129.7m3 in cash and liquid investments, ensuring it is well funded to execute the aggressive eight-rig drilling strategy and mining studies
Article content
Article content
| FireFly Managing Director Steve Parsons said: “The momentum at Green Bay continues to build, with exceptional drilling results and strong progress on upscaled production re-start studies. “We are now seeing the benefits of our eight-rig drilling strategy, which continues to both extend and infill the known mineralisation. We are looking forward to feeding these results into the Mineral Resource Estimate update planned for later this year. “In parallel with the aggressive drilling campaign, we have identified numerous compelling targets which we will test early next year. These have the potential to make a significant impact on the project. “And our economic studies are progressing well, with metallurgical tests and engineering work among the activities underway on this front.” |
Article content
By signing up you consent to receive the above newsletter from Postmedia Network Inc.
Article content
PERTH, Australia, Oct. 29, 2025 (GLOBE NEWSWIRE) — FireFly Metals Ltd (ASX/TSX: FFM) (FireFly or the Company) is pleased to report on a highly productive quarter which saw the Company generate more outstanding drilling results ahead of its next Mineral Resource Estimate update and progress its studies on an upscaled production restart at Green Bay.
Article content
Article content
HIGH-GRADE INFILL DRILLING
During the quarter, FireFly announced outstanding assays from infill drilling which continue to show why Green Bay is a world-class copper-gold project with very high grades, continuous mineralisation, scale potential and existing infrastructure in a tier-one location.
Article content
Article content

Article content
Article content
Figure 1: Long section through the Green Bay Ming underground mine showing the location of select drill results from ASX announcement dated 17 July 2025. Results from both the high-grade copper-gold VMS zone and broad copper Footwall Zone are shown. The green shape is a modelled DHEM anomaly (from hole MUG25-040 – see ASX announcement dated 7 May 2025 for further details). Drill assays >0.5% copper are shown in red.
Article content
The current Mineral Resource Estimate at the Green-Bay Copper-Gold Project stands at 24.4Mt @ 1.9% for 460Kt CuEq of M&I Resources and a further 34.5Mt @ 2.0% for 690Kt CuEq of Inferred Resources (see ASX announcement dated 29 October 2024).
Article content
An extensive six-rig underground drill campaign is underway with the dual objectives of growing the current Mineral Resource (four rigs) and upgrading more of the Inferred Resources to the higher-confidence Measured and Indicated (M&I) categories (2 rigs).
Article content
The upcoming Mineral Resource Estimate (MRE) update, due later this year, will underpin upscaled mining and economic studies currently underway and scheduled for completion in early CY2026.
Article content
Article content

Article content
Article content
Figure 2: Long section through the Ming Mine highlighting the current ~800m strike of the extremely high-grade core zone and remains open. The FWZ stringer style mineralisation is developed directly beneath the upper high-grade VMS. Clipping +/- 30m
Article content
About the Drill Results
Article content
FireFly acquired the Green Bay Copper-Gold Project in October 2023 and began an extensive underground drilling campaign at Ming Mine. Since this time, the Company has completed approximately 123,064m of diamond core drilling to 30 September 2025. The diamond drilling is part of the extensive underground development program for the planned upscaling of the past-producing Ming Mine.
Article content
There are two distinct styles of mineralisation present at the Green Bay Ming Mine, consisting of a series of upper copper-gold rich Volcanogenic Massive Sulphide (VMS) lenses underlain by a broad copper stringer zone, known as the Footwall Zone (FWZ).
Article content
Article content
The Footwall Zone is extensive, with the stringer mineralisation observed over thicknesses of ~150m and widths exceeding 200m. The known strike of the mineralisation defined to date is 2.3km and it remains open down-plunge (see ASX announcement dated 16 October 2025).
Article content
Drilling continues to demonstrate continuity of the high-grade copper-gold rich VMS mineralisation, with key intersections including 11.6m @ 9.3% CuEq, 14.6m @ 6.7% CuEq, 14.9m @ 5.5% CuEq and 5.5m @ 7.1% CuEq (~true widths) (see ASX announcement dated 17 July 2025).
Article content
Infill drilling of the broader copper-rich footwall stringer zone repeatedly intersected thick and continuous mineralisation exceeding 2% copper. Highlights include 26.2m @ 5.3% CuEq, 24.1m @ 3.7% CuEq and 9.5m @ 6.4% CuEq (~ true widths) – supporting the possibility of bulk‐scale mining from the footwall domain (see ASX announcement dated 17 July 2025).
Article content
The development of phase two of the 805L exploration drive has now been completed. Two drill rigs have been mobilised to the northern extent of the platform and are testing mineralisation up to 650m beyond the current MRE. Subsequent to the quarter, on 16 October 2025, it was announced that results of such drilling extended the known mineralisation by 430m beyond previous drilling and more than 650m beyond the current MRE.
Article content
Article content
Article content

Article content
Article content
Figure 3: Long section through the Ming Mine showing the location of drill platforms and drilling reported in the ASX announcement dated 17 July 2025. Assay results greater than 0.5% Cu are shown in red.
Article content
Resource Conversion Drilling from the 805L Exploration Drive
Article content
Drilling from the 805L drill drive focused primarily on upgrading the data density in the high-grade copper-gold dominated VMS lenses defined by previously reported exploration drilling. The results demonstrate strong continuity and consistent high grades in the Ming North and South VMS lenses in addition to the FWZ (where targeted).
Article content
Drilling from the 805L was predominantly completed from the 805L Crosscut 3 West, 805 Escapeway Access and the 850L stockpile (Figure 3).
Article content
Article content

Article content
Article content
Figure 4: Isometric view of drill positions in the 805L Exploration drill drive. Drill results from the ASX announcement dated 17 July 2025 are shown with copper assays >0.5% shown in red.
Article content
Significant intersections4 announced on 17 July 2025 from resource definition drilling include, but are not limited to:
Article content
805L Crosscut 3 West
Hole MUG24-128 comprised of a thick copper and gold rich massive sulphide zone with local sericite altered stringers immediately beneath, delivering an intersection of:
Article content
- 11.6m
@ 6.0% Cu, 3.9g/t Au, 11.4g/t Ag, 0.1% Zn (9.3% CuEq) from 187.4m (VMS-style)
Article content
Hole MUG25-032 contained an upper copper-gold massive sulphide zone grading into upper footwall style stringers:
Article content
- 14.6m
@ 5.4% Cu, 1.5g/t Au, 11.6g/t Ag, 0.3% Zn (6.7% CuEq) from 214.7m (VMS-style)
Article content
Hole MUG25-014 intersected a massive sulphide zone with strong copper-gold mineralisation:
Article content
- 5.5m @ 5.4% Cu, 2g/t Au, 8.1g/t Ag, 0.4% Zn (7.1% CuEq) from 208m (VMS-style)
Article content
805L Escapeway Access
Hole MUG25-015 intersected a thick zone of very high-grade stringer-style mineralisation, with chalcopyrite routinely exceeding 10% of the zone:
Article content
- 26.2m
@ 4.9% Cu, 0.4g/t Au, 7g/t Ag, 0.03% Zn (5.3% CuEq) from 167m (FW Stringer-style)
Article content
Hole MUG25-006 included numerous zones of copper stringer-style mineralisation, including:
Article content
- 32.9m @ 2.7% Cu, 0.1g/t Au, 2.9g/t Ag, 0.04% Zn (2.8% CuEq) from 154.2m (FW Stringer-style)
- 21.8m @ 2.0% Cu, 0.1g/t Au, 2.4g/t Ag, 0.01% Zn (2.1% CuEq) from 213m (FW Stringer-style)
Article content
Hole MUG25-009 intersected multiple thick zones of footwall stringer style mineralisation, including:
Article content
Article content
- 8.0m @ 2.1% Cu, 0.2g/t Au, 2.6g/t Ag, 0.01% Zn (2.3% CuEq) from 120m (FW Stringer-style)
- 4.3m @ 1.5% Cu, 0.1g/t Au, 2.4g/t Ag, 0.01% Zn (1.7% CuEq) from 155m (FW Stringer-style)
Article content
Hole MUG25-001 contained multiple zones of copper-dominated footwall stringer style mineralisation, including:
Article content
- 14.0m @ 1.8% Cu, 0.3g/t Au, 2.7g/t Ag, 0.04% Zn (2.1% CuEq) from 86m (FW Stringer-style)
- 15.6m @ 1.4% Cu, 0.1g/t Au, 2g/t Ag, 0.02% Zn (1.5% CuEq) from 150.9m (FW Stringer-style)
Article content
805L Stockpile
Article content
Hole MUG25-069W1 from the 850L Stockpile, the northernmost drilling completed to date, confirmed the presence of strong VMS-style mineralisation underlain by a broad footwall stringer zone. This stringer zone is at the projected margins of the lower footwall zone. Key intersections included:
Article content
- 6.4m @ 3.0% Cu, 3.6g/t Au, 25.6g/t Ag, 0.9% Zn (6.3% CuEq) from 458.7m (VMS-style)
- 20m @ 1.3% Cu, 0.1g/t Au, 1.3g/t Ag, 0.06% Zn (1.4% CuEq) from 572m (FW Stringer-style)
Article content
Resource Conversion Drilling from the 2200L Exploration Drive
Article content
Resource conversion drilling from the historical 2200 level of the Ming Mine is targeting an area of low drill density higher up in the mine, down-plunge of the historical shaft. (~500m RL).
Article content
Article content
Significant intersections5 announced on 17 July 2025 include, but are not limited to:
Article content
Hole MUG25-046 contained numerous mineralised zones throughout the hole, headlined by the broad intersection of:
Article content
- 24.7m @ 2.1% Cu, 0.2g/t Au, 2.3g/t Ag, 0.02% Zn (2.2% CuEq) from 201m (FW Stringer-style), including:
- 9.7m @ 2.8% Cu, 0.2g/t Au, 3.2g/t Ag, 0.02% Zn (3.0% CuEq) from 216m
Article content
Hole MUG25-005 intersected multiple zones of stringer-style copper dominated mineralisation, including:
Article content
- 5.4m @ 1.8% Cu, 0.1g/t Au, 2.0g/t Ag, 0.04% Zn (2.0% CuEq) from 130m (FW Stringer-style)
- 31.0m @ 2.2% Cu, 0.3g/t Au, 2.3g/t Ag, 0.02% Zn (2.4% CuEq) from 156m (FW Stringer-style)
Article content
Hole MUG25-034 drilled multiple zones of stringer-style chalcopyrite rich veins, with key intersections including:
Article content
- 8m @ 2.0% Cu, 0.2g/t Au, 2.5g/t Ag, 0.01% Zn (2.2% CuEq) from 138.7m (FW Stringer-style)
- 6.4m @ 1.8% Cu, 0.1g/t Au, 1.7g/t Ag, 0.01% Zn (1.9% CuEq) from 154.7m (FW Stringer-style)
Article content
STEP-OUT DRILLING FOR MINERAL RESOURCE GROWTH
Article content
During the quarter, FireFly conducted step-out drilling from the end of the Ming Mine exploration drive. Subsequent to the quarter, on 16 October 2025, it was announced that the results of such drilling extended the known mineralisation by 430m beyond previous drilling and more than 650m beyond the current MRE.
Article content
METALLURGICAL RESULTS
Article content
On 5 August 2025, FireFly announced results from a comprehensive metallurgical test program completed on ~1,500 kg of bulk samples of mineralisation from the Ming Mine at Green Bay, undertaken at the SGS Canada Inc. (SGS) metallurgical facility in Lakefield, Ontario.
Article content
The bulk samples for metallurgical testing incorporated representative samples of both the high-grade VMS lenses and the broader FWZ, and included numerous blend ratios to inform the economic studies.
Article content
The metallurgical test work is a key component of the economic studies currently underway, which will be incorporated into the Scoping Study6 due for completion in the March quarter of 2026.
Article content
Using an optimised flowsheet, metal recoveries to final copper concentrate from all samples averaged +98% for Copper, +75% for Gold and +78% for Silver. Subsequent gravity and conventional leach testing of the pyrite flotation tails improved precious metals recoveries, with gold recovery rising to +85% and silver to +84%.
Article content
These results are a significant improvement in comparison to recoveries attained by the previous operator through the small-scale 500ktpa Nugget Pond processing plant.
Article content
Article content
The improved gold recovery has the potential to enhance the economics of the upscaled restart, with the current MRE containing a total of 550koz of gold7 across all Mineral Resource categories, making it a significant contributor to potential future cash flow.
Article content
The ore proved metallurgically simple and amenable to conventional, low-cost processing, backed by favourable grindability (Bond Work Index of 10.4-11.4 kWh/t) and low abrasive index (0.1-0.18 g), suggesting lower than average power, maintenance and consumable costs.
Article content
These positive results will feed directly into refining processing design, cost models, and revenue assumptions in the upcoming economic and scoping studies.
Article content
ENVIRONMENTAL APPROVAL
Article content
FireFly is rapidly laying the foundations for a staged upscaled production restart at Green Bay.
Article content
As announced on 5 August 2025, FireFly has obtained a conditional environmental release (Environmental Release) from the Province of Newfoundland and Labrador that permits an initial upscaled restart of operations at Green Bay, with a processing plant throughput capacity of 1.8 Mtpa.8
Article content
Article content
As a result of this decision, no further detailed environmental and socio-economic assessments are required for that scale of restart, enabling FireFly to proceed toward construction permit applications and early works.
Article content
Applications for construction permits are underway, and early seasonal site preparation works are planned to begin in late 2025.
Article content
Ongoing environmental monitoring and closure planning are in progress, supported by external consultants to ensure compliance, including with the conditions of the Environmental Release.
Article content
The plant capacity is a technical specification forming part of the environmental submission and not a forecast of the estimated production of the mining operation. The mining operation’s forecast production will not be estimated until such time as the Company has prepared and announced its Scoping Study. Should a larger scale case be adopted than contemplated by the Environmental Release, further assessment may be required by government agencies.
Article content
ENGINEERING STUDY UPDATES
Article content
FireFly has engaged leading consultants to progress optimal mining and processing designs.
Article content
Conceptual mining studies by Entech recommend Transverse Long Hole Open Stoping (TLHOS) for the broader footwall zones and conventional Long Hole Open Stoping (LHOS) for the high-grade VMS zones, both utilising full backfill strategies to optimise extraction.
Article content
The Company is designing a paste backfill system that can encapsulate over 50% of tailings underground, offering both operational and environmental benefits.
Article content
Process engineering progress is also being advanced. Ausenco is refining the process flowsheet, incorporating the recent metallurgical testwork to guide design choices.
Article content
Preliminary design and trade-off studies for the tailings storage facility (TSF) have been completed by Knight Piesold, with final designs to be delivered in the coming months. Sterilisation and geotechnical drilling in the proposed TSF and processing plant areas have confirmed favourable rock conditions and did not intersect mineralisation.
Article content
Newfoundland and Labrador Hydro is conducting the power supply studies which are due for completion before the end of the year. Existing high voltage hydro transmission lines traverse the property and are expected to play an important role in the future development of the upscaled production at the Ming Mine.
Article content
Article content
In March 2025, Natural Resources Canada (NRCan) announced conditional approval of contribution funding of the Green Bay Power Assessment Project through the Critical Minerals Infrastructure Fund. Subsequent to the quarter, on 2 October 2025, NRCan and FireFly signed a non-repayable contribution agreement for up to C$613,775 in funding to support the Project. This project will advance electrification studies to support the development of infrastructure required to expand critical minerals production in the Province of Newfoundland and Labrador.
Article content
The overall study timeline suggests completion of a Scoping Study9 in the March quarter of 2026. The Scoping Study will integrate the mining, processing, infrastructure and permitting elements into one cohesive economic assessment.
Article content
REGIONAL EXPLORATION AND GREENFIELDS COPPER-GOLD TARGETS
Article content
On 24 July 2025, the Company announced the results of a modern geophysical campaign over the central Green Bay Copper-Gold Project claims, which has identified 325 conductive anomalies potentially caused by copper-gold bearing sulphide mineralisation considered to be look-alikes to the known deposits (e.g. Ming, Rambler Main, East Mine). The surveys, comprising airborne electrical (VTEM) and magnetic data plus localised ground electromagnetic (EM) follow-up, represent the first modern regional geophysics over the area and strengthen the case for significant discovery upside.
Article content
Article content
Geophysics is a key exploration tool at Green Bay, with the mineralisation at the Ming deposit and other known deposits exhibiting strong responses to electromagnetic surveys due to the conductive nature of the chalcopyrite-rich sulphide mineralisation.
Article content
Many of the 325 anomalies occur as coherent trends that exhibit strong resemblance to known mineralisation in the district. Similarities include geological setting, orientation of the trends (North-East, similar to Ming), and magnitude of the conductive responses.
Article content
Due to the significant number of high priority new geophysical targets, FireFly has mobilised a second surface diamond drill rig and plans to accelerate surface exploration, particularly in prospective zones such as the Hillbog and Southwest areas adjacent to the Ming, Rambler, and East Mines. The Company plans to systematically drill test the high-priority anomalies beyond the known deposits to confirm the cause of the anomalous response, which could include copper and gold bearing sulphides.
Article content
Based on the strength of the targets generated, the Company intends to fast-track the surface discovery program with part of the proceeds of the recent capital raising. A total of ~C$10 million raised via the issue of Canadian flow-through shares as part of the June 2025 equity raising (see ASX announcement dated 5 and 10 June 2025) has been allocated to discovery, targeting and testing of greenfields areas at Green Bay through to December 2026.
Article content
Recently, surface drilling has been focused on testing mineralisation proximal to historical deposits such as the Rambler Main and East Mines. Results previously announced from drilling at Main Mine included 10m @ 6.4% CuEq and 12.9m @ 4.3% CuEq (see ASX announcement dated 15 May 2025).
Article content
Article content

Article content
Article content
Figure 5: Multiple significant new targets from the recent airborne VTEM and magnetic geophysical surveys. The white dots represent bedrock conductive anomalies. There are numerous untested conductive trends in a similar orientation (yellow boxes) to the known mineralisation at the Ming, Rambler Main and East Mines (white boxes). So far, a total of 325 conductive responses have been identified which are significant and potentially caused by copper-gold bearing sulphide mineralisation.
Article content
Initial Targets
Article content
TILT COVE PROJECT
Article content
FireFly has commenced exploration at the recently acquired Tilt Cove Project, located approximately 30 km east of the Ming Mine. Tilt Cove is a large-scale copper-gold VMS system that historically produced around 170,000 t of copper and 50,000 oz of gold between 1864 and 1967, with limited modern exploration completed since.
Article content
Article content
Ground EM surveys have confirmed a strong, large-scale conductive anomaly (Figure 6) at the project, which is scheduled for drill testing later in 2025 (see ASX announcement dated 24 July 2025).
Article content
In addition, FireFly is completing a lease-wide airborne VTEM and magnetic survey over the project area, the first of its kind at Tilt Cove, with results to be reported as they become available (see ASX announcement dated 27 October 2025).
Article content
RAMBLER MAIN MINE AND EAST MINE AREA: HILLBOG TARGET
Article content
In addition to identifying the surface expression of both historical Rambler Main and East Mines, the airborne VTEM survey identified a large previously unknown look-alike anomaly 300m to the south of Rambler Main Mine, known as Hillbog (see ASX announcement dated 24 July 2025).
Article content
Drilling of this target has commenced.
Article content
SOUTHWEST TARGET AREA
Article content
In the Southwest portion of the Green Bay Project, approximately 8 km SW of Ming Mine, a series of large untested EM anomalies have been defined in prospective volcanic rocks (Figure 6). The area is covered by glacial sediments and boulders with very little outcropping exposures. The EM response is similar to known mineralisation within past producing copper mines on FireFly’s land package.
Article content
Article content
Article content

Article content
Article content
Figure 6: Tilt Cove Copper-Gold Project area showing the large-scale conductor (red) identified by FireFly’s ground-based EM survey. This conductor is significant and potentially caused by copper-gold bearing sulphide mineralisation. These results confirm an anomaly earlier identified in a 1983 EM survey completed by Newmont Exploration. The anomaly has yet to be drill tested and will be the subject of maiden drilling later in 2025.
Article content
FORWARD WORK PLANS
Article content
Near-term drilling activities at the Green Bay Copper-Gold Project will continue to focus on three key areas: Mineral Resource Growth, Upgrading the Mineral Resource (with infill drilling results) and New
Discoveries from both underground and surface. At 30 September 2025, the Company had completed 251 drill holes for ~123,064 metres of underground diamond drilling. A total of six underground rigs will continue to advance the underground Mineral Resource growth and development activities. Additionally, a second surface drill rig has been mobilised to fast-track surface regional discovery.
Article content
Green Bay (Ming Mine) Mineral Resource Growth and Development
Article content
The low-cost Mineral Resource growth strategy is underpinned by the 805L exploration drill drive at the Ming Mine. The Company has invested in 2,335 metres of underground exploration and ancillary development since acquisition of the project in October 2023 to provide drill platforms to accelerate growth and discovery from underground. The second phase of 805L Exploration drive has been completed, providing locations for both infill drilling and further down-plunge Mineral Resource extension. Underground drilling from the drill drive is currently underway to test the Ming mineralisation up to 650m beyond the current Mineral Resource boundary. Subsequent to the quarter, on 16 October 2025, it was announced that initial results of such drilling extended the known mineralisation by 430m beyond previous drilling and more than 650m beyond the current MRE. The relevant results included:
Article content
- 49.0m @ 6.1% CuEq (4.9% Cu & 1.3g/t Au) in hole MUG25-202 (~39.2m true thickness), including 14.3m @ 13.7% CuEq (10.6% Cu & 3.2% Au) (see ASX announcement dated 16 October 2025).
Article content
Article content
Development of additional platforms for further ongoing exploration and infill drilling will continue at Ming throughout 2025.
Article content
Upgrading the MRE remains a key priority for the Company’s plans to resume upscaled mining at Green Bay. Infill drilling is expected to upgrade the Inferred Resource (34.5Mt @ 2.0% CuEq) at Ming to the higher quality M&I Resource categories which currently stand at 24.4Mt @ 1.9% CuEq10.
Article content
Based on results to date, it is likely that the amount of mineralisation classified as M&I will increase in the MRE update currently planned by year-end 2025.11 This will be important for future economic studies.
Article content
Economic evaluation of the proposed upscaled resumption of production at Green Bay is in full-swing. Key consultants have been appointed to complete the economic studies, including Entech, Ausenco, Stantec and Knight Piesold. SGS have completed comprehensive metallurgical test work on samples of both VMS and footwall stringer-style mineralisation. The results have demonstrated considerable improvement (see ASX announcement dated 5 August 2025). Such results are expected to be a catalyst for ongoing discussions with potential offtake groups interested in securing the high-quality copper-gold concentrate expected to be produced from the Ming Mine. Various scenarios for an upscaled restart to operations are being evaluated. With the huge success of the drilling programs to date, the Company wishes to avoid unnecessarily limiting the size of any future potential upscaled mining operation until it has completed the next phase of growth drilling.
Article content
Article content
The first economic studies are currently planned for completion in Q1 2026.10
Article content
Having received from the Environmental Release from the Newfoundland and Labrador Department of Environment and Climate Change, FireFly will has now commenced applying for early works and construction permits.
Article content
Green Bay (Ming Mine) Regional Discovery
Article content
Based on the quality of targets identified, the Company is accelerating the regional discovery program at Green Bay over the next 6-12 months.
Article content
Surface drilling during 2025 has focused on extensions of mineralisation at Rambler Main Mine. Further assay results from this program are expected in the coming weeks. The second surface rig is testing targets beyond the known deposits. Key priority areas to be tested include the Hillbog prospect and Southwest target area.
Article content
Geophysics is a key exploration tool at Green Bay, with the mineralisation at Ming and other known deposits exhibiting strong responses to electromagnetic surveys due to the conductive nature of the chalcopyrite-rich sulphide mineralisation.
Article content
Targets identified by recent VTEM surveys are scheduled to be systematically drill tested in upcoming exploration drilling campaigns through to December 2026.
Article content
Exploration will also ramp up at the Company’s Tilt Cove Project. Follow-up drill testing of the conductive anomaly, that was confirmed by ground-based EM, is scheduled before the end of 2025.
Article content
Article content

Article content
Article content
Figure 7: Key 2024-2025 milestones for the Green Bay Copper-Gold Project.
1. Timelines are indicative and may be subject to change.
Article content
PICKLE CROW GOLD PROJECT
Article content
No field activities were undertaken by the Company at the Pickle Crow Gold Project during the quarter due to the team’s focus on the development and exploration activities at the Green Bay Copper-Gold Project.
Article content
As announced on 30 April 2025, the Company appointed BMO Capital Markets to assist with a strategic review with respect to the Company’s 70% interest in the high-grade Pickle Crow Gold Project (Strategic Review). The objective of the Strategic Review is to evaluate options to maximise value for shareholders and allow the Company to focus on progressing the Green Bay Copper-Gold Project. The BMO-led Strategic Review, including a thorough evaluation of strategic alternatives and recommendations to maximise shareholder value, is being evaluated and finalised. A conclusion is expected to be completed and released to the market by the end of 2025.
Article content
Article content
Investors are cautioned that there is no guarantee that the Strategic Review will result in the divestment of all or any part of the Company’s interest in the Pickle Crow Gold Project and the Company will otherwise keep the market updated in accordance with its continuous disclosure obligations.
Article content
CORPORATE
S&P/ASX 300 Index
On 5 September 2025, the Company was announced by S&P Dow Jones Indices as an addition to the S&P/ASX 300 Index, effective prior to the open of trading on 22 September 2025, as a result of the September quarterly review.
Article content
FINANCIAL OVERVIEW
Share Purchase Plan (SPP)
On 11 July 2025, FireFly announced that due to strong investor demand it had doubled its SPP from A$5.0 million to A$10.0 million. The SPP was completed on 14 July 2025, with the issue of 10,416,666 ordinary fully paid shares in the Company (New Shares).
Article content
The SPP was undertaken concurrently with the Company’s broader equity raising of ~A$98.1 million comprising the following components (together, the Equity Raising):
Article content
- ~A$11.2 million (~C$10.0 million) charity flow-through placement to Canadian investors at a price of approximately A$1.49 per share (Charity Flow-Through Placement) which completed on 13 June 2025 with the issue of 7,559,539 New Shares;
- ~A$54.9 million two-tranche institutional placement at a price of A$0.96 per share (Institutional Placement) of which the first tranche completed on 16 June 2025 with the issue of 28,064,281 New Shares and second tranche completed on 3 September 2025 with the issue of 29,166,667 New Shares; and
- ~A$32 million (C$28.4 million) fully underwritten Canadian bought deal offering with BMO Capital Markets at a price of C$0.86 per share (Canadian Offering) which completed on 23 June 2025 with the issue of 33,000,000 New Shares.
Article content
Article content
The net proceeds from the Equity Raising and SPP are primarily allocated to exploration and development expenditures at the Green Bay Copper-Gold Project, including underground development, resource extension and infill drilling, regional and near mine exploration and drill testing, and pre-construction and study works. The net proceeds were also be used to cover transaction costs of conducing the Equity Raising and will also be used for working capital.
Article content
CASH FLOW
Article content
At 30 September 2025, FireFly had a cash balance of A$114.3 million. During the quarter, the Company incurred net cash outflows from operating activities of A$2.8 million and investing activities of $17.8 million. The Company received net cash inflows from financing activities of A$35.3 million. Key movements by activity classification are provided below.
Article content
Operating Activities
Article content
The net cash outflow from operating activities for the quarter of A$2.8 million comprised:
Article content
- A$0.6 million payments for care and maintenance and site costs associated with the Green Bay Copper-Gold Project;
- A$0.9 million for payments of annual insurance premiums, payroll tax (for the prior financial year) and prepaid expenses;
- A$2.3 million payments for staff, administration and corporate costs in both Australia and Canada; and
- A$1.0 million receipts of interest and other income.
Article content
Investing Activities
Article content
The net cash outflow from investing activities for the quarter of A$17.8 million comprised:
Article content
- A$18.1 million for payments associated with the underground development drive, exploration drilling, and project and engineering studies expenditure at the Green Bay Copper-Gold Project;
- A$0.1 million for acquisition of plant and equipment; and
- A$0.4 million of proceeds received from the sale of plant and equipment.
Article content
Financing Activities
Article content
Net cash inflows from financing activities for the quarter of A$35.3 million comprised:
Article content
- A$10.0 million of gross proceeds from completion of the SPP on 14 July 2025;
- A$28.0 million of gross proceeds from completion of tranche two of the Institutional Placement on 3 September 2025, offset by:
- payment of A$2.5 million for transaction costs associated with the Equity Raising; and
- A$0.2 million for payments associated with the lease of equipment for the Green Bay Copper-Gold Project and office space.
Article content
PAYMENTS TO RELATED PARTIES
Article content
During the quarter, the Company made payments to related parties of A$380,000 which comprised executive directors’ salaries and superannuation, non-executive directors’ fees, and payments to Exia-IT Pty Ltd for IT support services and IT equipment.12
Article content
Article content
For and on behalf of the Board.
Article content
| Mr Steve Parsons | Jessie Liu-Ernsting | Media: |
| Managing Director | Corp Dev & IR | Paul Armstrong |
| FireFly Metals Ltd | FireFly Metals Ltd | Read Corporate |
| Phone: +61 8 9220 9030 | +1 709 800 1929 | +61 8 9388 1474 |
Article content
ABOUT FIREFLY METALS
Article content
FireFly Metals Ltd (ASX, TSX: FFM) is an emerging copper-gold company focused on advancing the high-grade Green Bay Copper-Gold Project in Newfoundland, Canada. The Green Bay Copper-Gold Project currently hosts a Mineral Resource prepared and disclosed in accordance with the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code 2012) and Canadian National Instrument 43-101 – Standards of Disclosure for Mineral Projects (NI 43-101) of 24.4Mt of Measured and Indicated Resources at 1.9% for 460Kt CuEq and 34.5Mt of Inferred Resources at 2% for 690Kt CuEq. The Company has a clear strategy to rapidly grow the copper-gold Mineral Resource to demonstrate a globally significant copper-gold asset. FireFly has commenced a 130,000m diamond drilling program.
Article content
FireFly holds a 70% interest in the high-grade Pickle Crow Gold Project in Ontario. The current Inferred Resource stands at 11.9Mt at 7.2g/t for 2.8Moz gold, with exceptional discovery potential on the 500km2 tenement holding.
Article content
The Company also holds a 90% interest in the Limestone Well Vanadium-Titanium Project in Western Australia.
Article content
For further information regarding FireFly Metals Ltd please visit the ASX platform (ASX:FFM), the Company’s website www.fireflymetals.com.au or SEDAR+ at www.sedarplus.ca.
Article content
COMPLIANCE STATEMENTS
Article content
Financial Information
Financial Information included in this announcement, including the Appendix 5B, is unaudited and has not been reviewed by the Company’s external auditor.
Article content
Mineral Resources Estimate – Green Bay Project
The Mineral Resource Estimate for the Green Bay Project referred to in this announcement and set out in Appendix A was first reported in the Company’s ASX announcement dated 29 October 2024, titled “Resource increases 42% to 1.2Mt of contained metal at 2% Copper Eq” and is also set out in the Technical Reports for the Ming Copper Gold Mine, titled “National Instrument 43-101 Technical Report, FireFly Metals Ltd, Ming Copper-Gold Project, Newfoundland” with an effective date of 29 November 2024 and the Little Deer Copper Project, titled “Technical Report and Updated Mineral Resource Estimate of the Little Deer Complex Copper Deposits, Newfoundland, Canada” with an effective date of 26 June 2024, each of which is available on SEDAR+ at
Recent Posts
